Preparation of Cleaner Production Plan and Progress Reports
Within the scope of the Integrated Pollution Prevention and Control Communiqué; washing, bleaching, mercerization, sizing, printing desizing etc. with an installed capacity of over 10 tons/day. Textile Facilities where pre-treatment, dyeing and finishing processes are carried out are subject to the provisions of this Communiqué.
As EKOÇED, our consultancy scope is;
- All kinds of substances to be given to water, air and soil during their production; ensuring the control of emissions, discharges and wastes,
- Çminimizing the negative effects that may occur on the environment,
- Ensuring efficient use of raw materials and energy with technologies compatible with clean production,
- Preparation, revision and follow-up of clean production plans
- After the approval of the cleaner production plans, each year Progress Reports are prepared and submitted to the relevant institutions.